Sub Floor Preparation

Why do you need sub floor preparation works… 

The key to a successful flooring installation is the preparation of the sub floor. Depending on the  chosen final floor product will vary on the amount of sub floor work required.  

Hatcher Flooring undertake all required sub floor preparation works:

  • Moisture Testing
  • Sub floor survey
  • Plyboard installation
  • Sub floor repairs
  • Installation of latex / screeds
  • Uplift / Disposal of existing flooring
floor preparation 1

Sub floor preparation work for carpet


Carpet is a flexible and versatile product which can be forgiving on most sub floors which it is laid on. Generally the only requirement would be the installation of a good quality plyboard if the existing floor boards are uneven.

This practice would reduce the risks of floorboards showing through following the carpet installation.
Carpet can be easily fitted on both wood and concrete sub floors with a good quality underlay.

Sub floor preparation work for laminate


Laminate flooring is a very hard wearing product however the sub floor needs to be dry and flat.
Laminate is susceptible to moisture therefore a moisture reading needs be taken prior to the commencement of any flooring works.

If the sub floor is chipboard or floorboards it will need to be solid and flat, if it is not then a suitable plyboard will need installing followed by a good quality moisture barrier laminate underlay.

Should the sub floor be uneven or have any ridges / dips then these will require repairing with a suitable screed to create a smooth flat surface ready to accept the flooring.

Luxury Vinyl Tiles (LVT)


LVT flooring requires the most amount of sub floor preparation works and is crucial for a successful installation.

If this type of flooring is being laid over floorboards a minimum of 9mm flooring grade plyboard is required followed by a smoothing compound, this process can differ depending on the current state of the floorboards.
If the sub floor is chip board and flat a 6mm flooring grade plyboard is required.

If the sub floor is concrete, firstly and most importantly it MUST be dry and have a suitable moisture barrier in situ. A moisture test reading will be taken using a hydrometer box to gain the relative humidity (RH Level) prior to the commencement of any flooring works. An RH level reading of 75% is dry, a reading above may need a DPM. A modern property will have a barrier installed however an older property will not therefore an Epoxy damp proof membrane (DPM) is required.

Once the moisture barrier is in situ a good quality screed is required to create a smooth flat surface. Multiple coats of screed may be required to get the desired sub floor ready for the LVT.

It is crucial for the sub floor to be smooth and flat as any light hitting the floor will highlight any unevenness.

Our Sub Floor Preparation Gallery